City Walk Upgrade

Past projects

Check out what we’ve been up to

City Walk Upgrade

This project recently completed for EDD was undertaken in the one of the busiest pedestrian areas in the City, City Walk.

Read More

Pondside Harrison

The site was a vacant site of approximately 5,000m2 and was designed for 12 new dwellings and associated landscape and common works.

Read More

Bonner 3A

The Bonner 3A project covers an area exceeding 150,000m2 and is one of the largest single areas of landscape undertaken in one package of works by the LDA.

Read More

Quattro Harrison

RAM undertook the total design and construction of this project including all approvals through to unit titling and handover.

Read More

Taylor Primary School

The Taylor Primary School project was complex and demanding due to the short program, requirement to work around other trades and the range of disciplines required represented.

Read More

Gungahlin Central Linear Park

Gungahlin Central Linear Park is large public park consisting of two spaces in the heart of the Gungahlin Town Centre, separated by the Centre’s main road – Hibberson Street.

Read More

Bible House Lane

Bible House Lane runs off Bunda Street adjacent to the Griffin Centre in the heart of Canberra City. The laneway is not only the service and delivery access for several restaurants and cafes in Garema Place, but it is also the access to car parking for 2 buildings, the pickup area for bulk waste bins which are collected daily and is a popular thoroughfare for pedestrians accessing Garema Place.

Read More

Yass Subdivision

RAM were engaged by the client to Project Manage the construction of stage 1 of a 650 lot subdivision.

The stage 1 works consisted of roads and services for 50 residential blocks and the construction of the main stormwater retention pond and parkland at the centre of the development.

Read More

Ainslie Shops Carpark

The works included the construction of a new asphalt carpark and associated lighting, storm water etc., at the rear of the shops; the total demolition of the front carpark: new storm water, electrical reticulation and lighting; new off form concrete stairs, pedestrian footpaths and paving; demolition of the existing toilet block and construction of a new architecturally designed toilet block; a laneway canopy structure; artwork installation and soft landscaping.

Read More

Section 20 Bonner

This development was funded, designed, built and sold internally.

From the early stages of planning we were intent on ensuring that the street appeal and functionality were of a level that would challenge the conventional First Home market – in both quality and outcome.

Read More

Harrison Sports Pavilion

RAM has recently completed construction of the Harrison Pavilion for ACT Procurement Solutions on behalf of ACT Sport and Recreation and Cricket ACT.

Read More

Majura Field Firing Range

This Project involved the demolition of the existing range facilities including encapsulation of contaminated fill. The range was then extended by 20m and totally rebuilt including ancillary buildings, new electrical, lighting and communications system.

Read More